Creating Your Dream Kitchen: How Long Does a Kitchen Remodel Last?

Kitchen remodels usually stay at the top of the home improvement projects people wish to undertake. They are popular projects that make the home space more functional and enjoyable.

When planning a kitchen remodel, a pertinent question that crosses every homeowner's mind is: "How long will the remodeling project last?" Kitchen remodeling is nothing like what appears on home remodeling shows where everything happens in an hour. TV shows fail to present the actual picture and skip the extensive planning and preparation required for a successful kitchen design and remodel. They only show where the old and outdated kitchen turns into a modern, sleek space in no time. 

Creating your dream kitchen will take a considerable amount of time. To avoid mistakes, never rush the process. You will then enjoy the desired results. 

How long does a kitchen remodel take?

There is no one-size-fits-all approach for kitchen remodeling. All kitchen remodels are unique, and the timeline and the remodeling process will vary for different kitchens. The project can last from a few weeks to some months. 

An average kitchen remodel project usually takes around 6 to 8 weeks when working with an experienced and skilled home remodeling contractor. Such remodels demand no changes in the layout and involve minimum demolition, construction, or customization. 

Similarly, complex remodels requiring extensive work, like reflooring, wall removal, and changes in floor plan may take around 10 to 12 weeks. A complete kitchen remodeling project may last for 3 to 5 months. DIY remodels or hiring an inexperienced contractor can elongate the project duration.

Project scope, kitchen size, material availability, budget, and design requirements are a few factors affecting the kitchen remodeling timeline.

Kitchen remodeling is a complex project and may need re-working the wiring, plumbing, flooring, appliances, lighting, island units, cabinets, backsplash, and countertops extensively. The more changes planned in these aspects of the kitchen design, the longer the project will stretch. Homeowners need to determine how long they are willing to work in alternative or temporary kitchen setup. 

Why does the kitchen remodeling timeline differ from other rooms?

Kitchen remodeling projects take longer than bedroom or living room remodels as kitchens have more detailed requirements. Other rooms in the home have few complicated needs, and it is easier to predict the remodeling time frame. Contractors also encounter more surprises and hiccups during kitchen remodeling, as there is a scope of things to go haywire even with the most planned remodeling projects. The construction and hardware parts in the kitchen remodel project needs more work than demolition or finishing.

The kitchen remodeling process

You should:

  • Set realistic goals and hire a reliable remodeling contractor 

  • Plan and design the kitchen based on budget and needs

  • Shop around for appliances, products, and equipment

  • Demolish the existing kitchen

  • The initial construction phase, such as making changes in the layout, rough-in plumbing, electrical, and mechanical

  • Install drywall and finish painting and flooring

  • Fix cabinets, countertops, appliances, lighting, backsplash, and other fixtures and hardware

  • Finishing touches and cleanup

Get the kitchen of your dreams!

A kitchen remodel project can transform your home's appearance. Hire a reputable and experienced kitchen remodeling contractor to have an accurate project timeline and plan your dream kitchen remodel.


Eagle Home Renovation is a family-owned general contracting business offering 20 years of experience in residential home remodeling. We remodel kitchens and bathrooms, garages, balconies, porches, deck porches, and more for homeowners in Richmond, VA, and surrounding areas. Call us today at (804)538-3334.

Previous
Previous

Differences Between a Porch and a Patio

Next
Next

Choosing a Home Remodeling Contractor: How to Evaluate the Candidates